Private EquityScreenerRefer

MARKET INSIGHTS

  • EventsNEWPrivate market milestones
  • NewsPrecize daily pulse
  • BlogsIn-depth articles and opinions

GUIDES

Explore Now
  • Unlisted SharesStep-by-step · KYC
  • BuyingStep-by-step · KYC
  • SellingExit in 24 - 48 hours
  • Pre-IPOReturns · risks · case studies
  • Tax GuideBudget 2026 changes
  1. Home
  2. Unlisted share news
  3. Vikram Solar Boosts Manufacturing Capacity With 1 Gw Expansion At Falta…

Vikram Solar Boosts Manufacturing Capacity With 1 Gw Expansion At Falta Facility In West Bengal

20 Feb 2025

Add as preferred source
Key Takeaways

Vikram Solar’s 4.5 GW capacity boost enhances efficiency, supports Atmanirbhar Bharat, and strengthens renewable energy sector sentiment in financial markets.

Vikram Solar’s 4.5 GW capacity boost enhances efficiency, supports Atmanirbhar Bharat, and strengthens renewable energy sector sentiment in financial markets.

vikram solar unlisted shares

Vikram Solar

0.00%

Expert Analysis

Vikram Solar Expands Falta Facility by 1 GW, Boosts Capacity to 4.5 GW.

Expert Analysis:

  • Capacity Expansion & Technology Upgrade: Vikram Solar expanded the Falta facility by 1 GW in West Bengal and upgraded the Oragadam facility to produce advanced TOPCon and HJT modules.

  • Production Capacity Growth: Vikram Solar's expansions increase annual nameplate capacity to 4.5 GW, strengthening its position in the renewable energy sector.

  • Leadership Statement: CMD Gyanesh Chaudhary highlights that the Kolkata and Chennai expansions enhance production, efficiency, and sustainability with advanced manufacturing techniques.

  • Commitment to Atmanirbhar Bharat: Chaudhary emphasizes that expansions will enhance high-quality panel production, supporting self-reliance and a greener future.

  • Expansion Milestones: Falta Project achieved 1 GW expansion since December 5, 2024, while Chennai's July 19 upgrade boosted Oragadam’s production capacity.

Publisher:Energetica india